Top 10 Long Lead iPhone UK – Lightning Cables

As an Amazon Associate I earn from qualifying purchases.

1. Gritin

#ad

IPad, Gritin iPhone Charger Cable, 6.6ft/2m Lightning Cable-Apple MFi Certified Nylon Braided iPhone Charger Cable Fast Charging Cable Lead for iPhone 11 Pro XS Max X XR 8 7 6s 6 Plus SE 5 5s, iPod

#ad
Gritin #ad - Up to 10, 000+ plugging and unplugging lifespan, 000+ bend and 6, which is proved a superior toughness than original device cables. No warning message pops up at all. Designed for saving charging and sync time: lower resistance value tinned copper wires inside with Apple MFI connector ensure a maximum charging speed up to 2.

4a and transfer data up to 480 Mbits. It is easier for you to use the devices while charging simultaneously. Length 2m -more convenient charging experience: the 2m-long cable provides you enough freedom and convenience to charge your devices wherever you are at home, in the office, hotel or car. Apple mfi-certified, safe & reliable: apple's offical issued smart chip ensures that your Apple devices could sync and charge at full speed safely as orginal cable.

Perfect compatibility: this mfi-certified cable perfectly fits for apple devices with 8-pin lightning port such as iphone 11 pro/ xs / XR / 8 / 6s Plus /6 Plus / 8 Plus / 7 / SE / 5c / XS Max / 6 / 6s / 7 Plus / X / 5s / 5, iPad mini, iPad Air, iPad Pro, iPod nano, iPad, iPod touch and more. Built to last: premium density double-braided nylon exterior with tinned copper wires inside and laser-welded putted on connectors for maximum reliability and durability.
BrandGritin #ad
ManufacturerGritin #ad
Height1.7 cm (0.67 Inches)
Length10 cm (3.94 Inches)
Width10 cm (3.94 Inches)
Part Number5176784031
ModelDEJUAE

2. Aioneus

#ad

IPhone Charger 2M 3Pack, Aioneus Lightening Cables iPhone Fast USB iPhone Charging Cable Nylon Braided Long Charger Lead for iPhone 12 Pro Max Mini 11 Pro XR XS X 10 8 7 6s 6 Plus 5s 5 SE iPad iPod

#ad
Aioneus #ad - 3pack 2m lightning cable: with 2m long iphone braided charger, you can lie on the couch and use your devices while charging them at the same time. The ultra-long cable offers the extra freedom to charge your devices in your bedroom, office and even in the backseat of your car.

Fast charge iphone charger: lightning cable built-in high-quality copper wire ensures your devices the faster possible charging speed up to 2. 4a and stable data syncing up to 480MB/s, which charge faster than most standard iPhone charger cables. More durable and flexible: aioneus phone chargers iphone covered with premium colorful nylon braided exterior with pure copper wires inside, ensure the charger for iphone durability, flexibility and functionality. Perfect compatibility: phone charger for iphone 12/12 pro/12 pro max/11/ 11 pro/11 pro pax/xr / ipad pro 12.

9-inch / 5c / xs / 7 plus/6s plus /6s /6 plus / xs max / x /10/ 8/ 8 plus /7 / air 2/mini/mini 2 /mini 3 /mini 4/mini 5/ipad 2/ 3/4/ 5/ ipad 7th/ 6th /4th gen/ipad Touch 5th gen / Pro 9.7-inch/pro 2020/pro 11/air / 6/5s / 5 /se/ se 2020, compatible with all iOS9, iOS10, iOS11, iPad Pro 10.5-inch / nano 7th gen, iOS12 devices. Lifetime replacement: aioneus iphone cable 3pack 6FT Blue+Orange+Green with Lifetime Replacement & 24*7 friendly customer support ensure your pleasing shopping experience.
BrandAioneus #ad
ManufacturerAioneus #ad
Part NumberCavo 3pack

3. Cabepow

#ad

CABEPOW Long Lightning Cable 2M,High Fast 6ft iPhone Charging Cable Lead with Metal Connector for iPhone 11/11Pro/11Max/XS/XR/XS Max/8/7/6/5S/SE, MFi Certified 2Pack 2M iPhone Charger Cable

#ad
Cabepow #ad - Mfi certified lightning cable : each cable contains an authorization chip issued by iphone to ensure 100% compatibility with iPhone, iPad, ensured safe charging for your iphone devices. The super slim iPhone connector head slots into virtually all case openings.

Our technology teams make thousands of tests to ensure 100% safety for your device. Remarkable iphone charger for outdoor : Double shielding and tangle free design significantly enhance the interference protection to cope with any outdoor activities. Ultra durable iphone charger : reinforced stress points with a 10000+ bend lifespan make iPhone cord many times more durable than anything else on the market. Don't be denied your case of choice by a bulky cable.

The anodized connectors ensure superior functionality under heavy usage. The cables core and the multi strand premium copper core wires ensure superior data transfer with fast and stable charging. Support iphone x / 5, iPod touch and iPod touch. Compatible with all iOS9 devices. Enjoy fast data transfer, iPod. Built with iphone's original C48 terminal and smart chip. Original 8 pin connector with a lightning end, syncing and charging.
BrandCabepow #ad
ManufacturerCabepow #ad
Height0.25 cm (0.1 Inches)
Length2.54 cm (1 Inches)
Width2.54 cm (1 Inches)
Part Number5-02 lightning 8pin 2M CABLE,
Model5-02 lightning 8pin 2M CABLE,

4. Aioneus

#ad

IPhone Charger Cable 3M/2M/1M 3Pack Aioneus MFi Certified iPhone Lightning Cable Braided Fast Charging Cable Long Charger Lead for iPhone 11 Pro XR XS Max X 10 8 7 6s 6 Plus 5 5s SE, iPad Pro Air

#ad
Aioneus #ad - The iphone lead is also tangle free and flexible which makes your life more convenient. Any questions, please feel free to contact us and we will provide you with a good solution. Strong nyalon-braided iphone charger: these lightening charger cables for iphone is well made with smooth double - braided Nylon that could protect wire cores.

Perfect compatible iphone charging cable : make for iphone, ipad and ipod. What you can get: you will get 3pack different length nylon braided iphone charging cable 1M+2M+3M with 18 months Worry-Free Replacement and 24*7 friendly customer support ensure your pleasing shopping experience. 3pack/1m+2m+3m iphone charger lead: with the perfect 3m iphone charger, you can freely use your phone in bedroom, car, the 2M iPhone cable is convenient to use while in couch, or office; 1m charger lead is ideal for Power Bank and Laptops. Fast charging and sync iphone charger:this iphone charger cable transfer speed up to 480Mbps, and charge speed is fairly fast, the maximum output of this iphone charging lead is 2.

4a, data transfer and high speed charging 2 in 1. Fast cell phone charger for iphone 11/ 11 pro/11 pro pax/xr / 7 plus/6s plus / se/ se 2020, compatible with all ios9, ios10, ios11, ipad pro 10.5-inch / 6/5s / 8 plus /7 / 6 plus / xs / xs max / air 2/mini/mini 2 /mini 3 /mini 4/mini 5/ipad 2/ 3/4/ 5/ ipad 7th/ 6th /4th gen/ipad Touch 5th gen / 6s / 5 / 5c / iPad Pro 12.9-inch / x /12 max/12 pro/10/ 8 / Pro 9. 7-inch/pro 2020/pro 11/air / nano 7th gen, iOS12 devices.
BrandAioneus #ad
ManufacturerAioneus #ad

5. Cabepow

#ad

MFi Certified 2Pack 3M iPhone Charger Cable, CABEPOW Long Lightning Cable 3M,High Fast 10ft iPhone Charging Cable Lead with Metal Connector for iPhone 11/11Pro/11Max/XS/XR/XS Max/8/7/6/5S/SE

#ad
Cabepow #ad - The super slim iPhone connector head slots into virtually all case openings. Original 8 pin connector with a lightning end, syncing and charging. Remarkable iphone charger for outdoor : Double shielding and tangle free design significantly enhance the interference protection to cope with any outdoor activities.

Enjoy fast data transfer, iPod. Built with iphone's original C48 terminal and smart chip. Our technology teams make thousands of tests to ensure 100% safety for your device. Contact us if anything we can do for you and we will reply you with a satisfied solution within 24 hour. Perfect compatible iphone cable : made for iphone, ipad and ipod case. Superior quality : iphone connector, syncing and charging at the same time at the fastest speed on your iPhone devices for short length.

Mfi certified lightning cable : each cable contains an authorization chip issued by iphone to ensure 100% compatibility with iPhone, iPad, ensured safe charging for your iphone devices. Don't be denied your case of choice by a bulky cable. Support iphone x / 8 / 5s / 6 / 6s / 8 plus / air 2, ipad pro/ ipad pro 12.9-inch / ipad pro, ipad, ipad mini case / 7 / 5, iPod nano, iPad Air / mini 3 / iPad Pro 12.9-inch / mini 2 / se / 5c / 6s plus /6 plus / 7 Plus / mini 4, iPod touch and iPod touch. Compatible with all iOS9 devices.
BrandCabepow #ad
ManufacturerCabepow #ad
Height0.25 cm (0.1 Inches)
Length2.54 cm (1 Inches)
Width2.54 cm (1 Inches)
Part Number5

6. Marchpower

#ad

White, iPad, Marchpower iPhone Charger Cable, MFi Certified iPhone Lightning Cable 3 Pack 123m Apple Charging Cable Long iPhone Leads for iPhone 11 Pro XS Max X XR 8 7 6s 6 Plus SE 5, iPod

#ad
Marchpower #ad - Quality assurance3 pack 1+2+3m white extra long ipad charging cables. Enter the code 7ydkywkI at checkout, you can save £1. 00 when you purchase 2 or more. Charging your ios devices without error messages. Fast syncing and charging in short time save your time. With a 3m extra long cord, you can lie on the couch and use your devices while charging them at the same time.

Proven to withstand 15000+ bends. 4a fast charging and 480 Mbps transferring speed. Every purchase from us enjoys a 12 months guarantee. Universal compatibilityreliable mfi certified iphone lead for iphone xs max / pad air / 8 plus / phone 7 / se / 6s / 6 plus / pad 4th gen / 6s plus / xr / Pod Touch 5th gen / mini 2 / 7 Plus / Pad Pro / 5s / air 2 / pad mini / 5c / 6 / mini 4 / x / 5 / 8 / Pod nano 7th gen. Safe and fast charging iphone cablemarchpower long lightning cables are made of high purity core and smart lightning chip, which can support up to 2.

We have been working on to provide customers the best shopping experience. Compact usb connector head ensure this ipad cable fit most phone cases and accessories. Reliable, the terminals are durable reinforced, affordable and well-constructed Apple charger cable. Durable iphone charger cablethese upgraded iphone cords are made of high quality heat-resistant aluminum alloy, which designed to last the use-time.
BrandMarchpower #ad
ManufacturerMarchpower #ad
Part NumberAP123-White
WarrantyLifetime Guarantee

7. Cabepow

#ad

CABEPOW MFi Certified 6ft iPhone Cable,Data Sync Long Lightning Cable/Fast iPhone Charging Cable Lead for iPhone 11/11Pro/11Max/Xs/Max/XR/X/8 Plus/7 Plus/6 Plus/5s/SE, 3Pack 2m iPhone Charger Cable

#ad
Cabepow #ad - Remarkable iphone charger for outdoor : Double shielding and tangle free design significantly enhance the interference protection to cope with any outdoor activities. The anodized connectors ensure superior functionality under heavy usage. Our technology teams make thousands of tests to ensure 100% safety for your device.

Perfect compatible iphone cable : made for iphone, ipad air / ipad pro 12. 9-inch / 5s / 8 / ipad pro 9.7-inch, ipod nano, ipad mini / mini 2 / se / 5c / 6 / mini 4, ipad and ipod. Support iphone x / 7 plus / air 2, iPad, iPad Pro 105-inch / 6s plus /6 plus / 8 plus / 6s / 7 / mini 3 / iPad Pro 12.99-inch / 5, ipod touch and iPod touch. Compatible with all iOS9 devices. The cables core and the multi strand premium copper core wires ensure superior data transfer with fast and stable charging.

Superior quality : iphone connector, syncing and charging at the same time at the fastest speed on your iPhone devices for short length. Don't be denied your case of choice by a bulky cab. What you get : iphone cable including 2M 3Pack, our fan-favorite 18 months worry free and friendly customer service. Ultra durable iphone charger : reinforced stress points with a 10000+ bend lifespan make iPhone cord many times more durable than anything else on the market.
BrandCabepow #ad
ManufacturerCabepow #ad
Height0.25 cm (0.1 Inches)
Length2.54 cm (1 Inches)
Width2.54 cm (1 Inches)
Part Numberi52m
Modeli52m

8. Cabepow

#ad

CABEPOWMFi Certified2Pack 10ft Long Lightning Cable, iPhone Charger cable 3M, High Fast/Data Sync iPhone Charging Cable Lead for iPhone 11/11Pro/11Max/XS/XR/XS Max/8/7/6/5S/SE iPad White

#ad
Cabepow #ad - Iphone mfi certified lightning cable: each cable contains an authorization chip issued by to ensure 100% compatibility with iPhone, iPad, ensured safe charging for your iphone devices. Enjoy fast data transfer, iPod. Built with iphone's original C48 terminal and smart chip.

Original 8 pin connector with a lightning end, syncing and charging. Practical fishbone designaccording to the experimental results, the fishbone design can accept at least 15, 000 bending and insertion tests. Tpe&pvc material maximizes the durability and excellent wear resistance of the cable without tangling. Iphone mfi certification: ensures complete high speed charge and sync compatibility with iphone 11 / 5th / 2, ipad 6th / 3 / 6s / se / xr / 6 / 11pro / 5s / 3th / 6 plus / 5C / 7 / 4th / X / 8 Plus / 2th generation, ipad, iPad Air 2, iPad mini, iPod Touch 6th / xs / 6s Plus / 5, iPad Pro, iPad Air, ipad mini 4 / 8 / 7 plus / 11max / xs max / 5th generation.

Contact us if anything we can do for you and we will reply you with a satisfied solution within 24 hour. 12 months customer service: this cable is built to last so we provide 12 months worry free friendly customer service. Ultra high quality assurance: reinforced iPhone charger cable with special SR joint design that have passed 40000+ times bending tests for extra protection and durability.
BrandCabepow #ad
ManufacturerCabepow #ad
Height0.25 cm (0.1 Inches)
Length2.54 cm (1 Inches)
Width2.54 cm (1 Inches)
Model2pack10FT

9. Syncwire

#ad

2M Apple MFi Certified Nylon Braided Apple Charger Lead USB Fast Charging and Sync Cable for iPhone 11 Pro Xs Max XR X 8 7 6 6s Plus SE 5s 5c 5, iPad, iPod, Syncwire Lightning iPhone Charger Cable

#ad
Syncwire #ad - Encrypted braided + aluminum foil double-layer shield aims for data transmission stability and keeping your Apple devices completely safe. Revolutionary durability: made with extremely durable bulletproof fiber and highly elastic TPE material, the cable can withstand over 12, and covered with premium double-braided nylon jacket, 000 times of bending and hold up to 110 pounds 50KG.

Apple mfi certified: with apple's original c48 connector and smart chip, ipad, ipad pro, syncwire fansful series lightning cable ensures 100% high speed charge and sync compatibility with iPhone SE 2020 / 11 Pro / 5S / 11 / 5C / 8 Plus / 6s / XS / 8 / 6s Plus / SE / 7 / 7 Plus / 11 Pro Max / 6 / X / 6 Plus / XS Max / XR / 5, iPod. Premium double-braided nylon: premium double-braided nylon prevents knotting and thus makes it easier to use and store.

The lightning end can be applied 15kg vertically without broken. The nylon braided cable is super smooth and comfortable in touch, yet proven to be 12x more durable than original iPhone charger cable. What you get: syncwire fansful series Nylon Braided Lightning Cable 2M, our worry-free 36-month warranty, and friendly customer service. High speed charging & sync: high purity tinned copper wires make charging faster and more stable, ensuring a maximum charging speed up to 2. 4a, 20% faster than other iPhone cables.
BrandSyncwire #ad
ManufacturerSyncwire #ad
Height11 cm (4.33 Inches)
Length11 cm (4.33 Inches)
Width2.2 cm (0.87 Inches)
Part NumberSW-LC321
ModelSW-LC321
Warranty12+24 months warranty

10. Ofuca

#ad

IPhone Charger Cable, Lightning Cable 3Pack 6FT/2M iPhone Charger Braided Long iPhone Charger Lead USB Fast Charging Cable Compatible with iPhone 11/Pro/Xs Max/X/8/7/Plus/6S/6/SE/5S iPad and More

#ad
Ofuca #ad - Perfect length6ft iphone charger is great length to replace the original 3ft one, perfectly free up your charging time. Creative new construction:reinforced iphone charger cable with special SR joint design that have passed 40000+ times bending tests for extra protection and durability.

2. 4a fast charge & syncthis iphone charger cable supports fast charging up to 2. 4a while preventing overheating and overcharging, ensure that you and your devices are safe, sync and charge at the same time at the fastest speeds on your windows PC or Mac. Perfect compatibilitythis iphone charger cable is fully compatible with iphone 11 pro max/ xs / 6s / 6 / 7 / 5s / 8 / xr / xs max / 7 Plus / 5c / 6s plus /6 plus / X / 8 Plus / SE / 5, iPad, iPod Nano, iPad Pro, iPad Air, iPad mini, iPod touch as well as the latest IOS 11 12 13 system.

Our service team will reply you with satisfied solution within 24hours, if you have any questions, to prove the importance we set on quality. The solid and durable two-shade braided armor nylon shield gives the cable stronger protection and flexible performance than others and no need to worry about tangling, effectively prolong the service life. Warranty policywe have a 12-month service, don't hesitate to contact us. You can purchase with confidence.
BrandOfuca #ad
ManufacturerOfuca #ad
Part NumberBD15-3P2M-iPhone Charger Cable
ModelBD15 iPhone Charger Cable
WarrantyManufacturer warranty for 12 months from date of purchase